<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Replication on myvirtualcloud.net</title><link>https://myvirtualcloud.net/tags/replication/</link><description>Recent content in Replication on myvirtualcloud.net</description><generator>Hugo</generator><language>en-us</language><copyright>Andre Leibovici</copyright><lastBuildDate>Sat, 31 Jan 2015 16:32:54 +0000</lastBuildDate><atom:link href="https://myvirtualcloud.net/tags/replication/index.xml" rel="self" type="application/rss+xml"/><item><title>How I configured my Nutanix Cluster for Synchronous Replication</title><link>https://myvirtualcloud.net/how-i-configured-my-nutanix-cluster-for-synchronous-replication/</link><pubDate>Sat, 31 Jan 2015 16:32:54 +0000</pubDate><guid>https://myvirtualcloud.net/how-i-configured-my-nutanix-cluster-for-synchronous-replication/</guid><description>&lt;p&gt;Now that &lt;a href="https://myvirtualcloud.net/?p=6897" target="_blank"&gt;NOS 4.1.1 is generally available&lt;/a&gt; I decided to make some time to upgrade my two production clusters to the latest release and enable metro cluster availability (synchronous replication). Given that I was already at the job I started ScreenFlow for Mac and recorded the configuration steps for the setup. I have never seen synchronous replication that simple before.&lt;/p&gt;</description></item><item><title>Nutanix Metro Availability Operations – Part 3</title><link>https://myvirtualcloud.net/nutanix-metro-availability-operations-part-3/</link><pubDate>Thu, 18 Dec 2014 22:22:51 +0000</pubDate><guid>https://myvirtualcloud.net/nutanix-metro-availability-operations-part-3/</guid><description>&lt;p&gt;In the &lt;a href="https://myvirtualcloud.net/?p=6769"&gt;first part of this Nutanix Metro Availability series&lt;/a&gt; I discussed datacenter failure recovery operation (failover) to a secondary site. In the &lt;a href="https://myvirtualcloud.net/?p=6784"&gt;second part&lt;/a&gt; I talk about the operational procedure to resume normal operations after a successful failover. In this third and last part I discuss the operational procedure to recover an entire datacenter to a new Nutanix cluster in a new site.&lt;/p&gt;</description></item></channel></rss>