F5 Networks released a deployment and procedures guide for VMware View. This document provides guidance and configuration procedures for deploying the BIG-IP Local Traffic Manager (LTM) v10 with VMware View.
Probably one of the most interesting features provided by F5 BIG-IP appliance is the ability to create UDP tunneling with dTLS (datagram TLS) and TCP fall back. dTLS aim to improve PCoIP UDP end user experience over high latency networks such as the internet.
The video below demonstrate the capabilities of the dTLS datagram:
Deploying the BIG-IP LTM system with VMware View is tested and validated with BIG-IP LTM v10.0 and 10.1 and View v4.
The deployment guide can be found here.






Recent Comments